Free, practical guides on Gantt charts and project scheduling, what they are, how to build them in Excel, Google Sheets and PowerPoint, how the critical path works, and real examples for every kind of project. When you're ready, build yours free in the Gantt maker, no sign up.

Basics

🔀

PERT vs Gantt

How a PERT network and a Gantt timeline differ, and how to use both together.

🔷

Milestone vs Gantt Chart

How a milestone chart of key dates differs from a Gantt of the work between them.

🧩

Break a Project Into Tasks

How to decompose a goal into right-sized, single-owner work packages using deliverables and the 8/80 rule.

📊

Gantt vs Spreadsheet

Where a planning spreadsheet breaks, when it is enough, and what a Gantt tool adds.

💻

Gantt for Software Dev

Map software phases, cross-team dependencies, and the release date without killing agile flow.

🎓

Thesis Gantt Chart

Plan a dissertation on a Gantt chart with phases, supervisor lag and a real deadline buffer.

📣

Gantt Chart for Marketing

Plan a campaign on a Gantt: phases, parallel channels, approvals, and a fixed launch date.

🎉

Gantt Chart for Events

Plan an event backward from its fixed date with workstreams, milestones, and lead times.

🏗️

Gantt Charts for Construction

How construction schedules use Gantt charts for phases, curing lag, procurement and trade sequencing.

📊

What is a Gantt chart?

The fundamentals, bars, dependencies, milestones and phases, and why teams use them.

🗂️

Gantt chart examples

12 real examples, construction, software, marketing, events and more, with templates.

◆

Milestones vs tasks

A task takes time, a milestone marks a moment, plus a legend for every symbol on a Gantt chart.

📜

Who invented the Gantt chart?

The real history: Adamiecki drew it first in 1896, Gantt made it famous, and why his name stuck.

🌳

What is a WBS?

Split a project into deliverables and work packages before you schedule, with the 100% rule and a worked example.

📋

Gantt chart vs Kanban board

Plan against time or manage flow, the real difference, when each wins, and how to use both.

🗺️

Gantt vs timeline vs roadmap

Three views of time at three levels of detail, and who each one is really for.

Build one

Scheduling technique

🏃

Sprint Planning on a Gantt

Lay sprints as time boxes on a Gantt to see the release arc and its risks.

🔁

Recurring Tasks

When to show repeating work as a series, roll it into one bar, or leave it off the chart.

🕸️

Network Diagrams Explained

How the precedence diagram maps activities and dependencies and drives the critical path and Gantt chart.

💰

Cost-Loading a Schedule

Assign cost to tasks so the Gantt produces a time-phased spend plan and S-curve.

🛡️

Buffer and Contingency

Why pooling safety into one project buffer beats padding every task in a schedule.

📌

Task Constraints Explained

How ASAP, must-start-on and deadline constraints shape a schedule and can hide conflicts.

⏳

Duration vs Effort

Why effort, duration and elapsed time differ, and how availability and waiting stretch your estimates.

🔄

Agile and Gantt Charts

Use a Gantt for the release and dependencies while sprints run the day to day detail.

🎯

Critical path method

What the critical path is, how it's calculated, and how to use it to hit deadlines.

🔗

Dependencies explained: FS, SS, FF, SF

The four link types with a diagram for each, plus lead, lag and why the type changes what happens when dates move.

◳

Baseline vs actual: tracking variance

How to freeze a plan, read start and finish variance, and know when re-baselining is honest and when it is not.

⏳

What is float (slack)?

How long a task can slip before it delays the project, total vs free float, and how to read it off your chart.

🔢

How to estimate task durations

Analogous, parametric and three-point estimation, with the PERT formula and when to use each.

⏱️

Lead time vs lag time

Overlap two tasks or force a wait between them, with the sign trick and a worked example.

⏩

Fast-tracking vs crashing

Two ways to shorten a schedule without cutting scope: one costs risk, the other costs money.

👥

Resource leveling

Fix a schedule that asks one person to be in two places at once, leveling vs smoothing.

Practice & tools