Download a ready-made Gantt chart for Excel, Google Sheets or PowerPoint, or open any template in the free online editor and customize it in seconds. Browse by industry, use case, timeframe, methodology or file format — every template is free, needs no account, and exports to PDF, PNG, Excel and PowerPoint.
Purpose-built plans with the right phases and milestones already laid out.
Go-to-market plan from research and positioning through launch day and review.
Plan features and releases across quarters — the PM's strategic timeline.
Plan an event end-to-end: venue, vendors, promotion and run-of-show.
A 12-month wedding countdown of vendors, bookings and milestones.
Permits, demolition, trades and final walkthrough on one schedule.
The rolling site window, generated from your master schedule instead of retyped each Monday.
Planned against actual progress, with the schedule variance and SPI worked out for you.
Assessment, landing zone, migration waves, cutover and decommission.
Stage-gate pipeline from concept through design freeze to production release.
Beta, store listing, review submission and phased rollout — with the review wait as a real dependency.
Discovery, IA, build, content migration and the redirect map that sinks these projects.
Case for support, quiet phase, public launch, matched giving and stewardship.
Profiling, mapping, cleansing and the mock loads you need before you can trust reconciliation.
Data room, parallel workstreams, SPA negotiation and closing — against exclusivity expiry.
Migration and deduplication are the real work; cutover timed not to wreck a forecast.
RTO/RPO drive the design; tabletop, partial and full failover each need a change window.
Clarifications, a fixed submission date, evaluation, standstill and award — mostly other people’s dates.
Custom-code remediation, three mock cutovers, a dress rehearsal and the freeze nobody budgets for.
Waves over years: unglamorous foundations first, benefits reviewed after each wave, not at the end.
Hour zero, risk assessment, notification, retrieval and quarantine, then effectiveness checks.
The records of processing are the foundation; DSAR and breach clocks need tested processes.
Everything switches at one moment — with trademark clearance as the long lead that can kill a name.
Sector-specific schedules for construction, software, marketing and more.
Phased build plan: pre-construction, foundation, structure, interior and handover.
Agile plan from discovery through sprints, QA and release.
Campaign timeline across content, design, paid and launch.
A term-by-term plan for students and PhD researchers.
A 12-month plan: proposal, literature review, ethics, fieldwork, analysis, submission.
Multi-year programme view: candidacy, fieldwork, writing up, submission and viva.
Work packages, deliverables and reporting periods — figure-ready for applications.
A generic five-phase project plan — initiation to closeout.
Schedules built around how these projects actually sequence — permitting and interconnection before construction, departments before opening day.
Full STO lifecycle: long-range planning, scope freeze, execution window and start-up.
Feasibility, interconnection, permitting, racking and commissioning to energization.
Site assessment, utility coordination, trenching, install and network activation.
Six-month countdown by department: Rooms, F&B, Engineering, HR and Sales.
Resource measurement, consent, grid connection, foundations, erection and first power.
Exploration, resource drilling, feasibility gates, development and production ramp-up.
Yard milestones: class approval, steel cutting, keel laying, outfitting and delivery.
Time-and-action calendar: tech pack, samples, bulk fabric, cutting, sewing, ex-factory.
Piling, substructure, deck and surfacing — with possession windows and weather-restricted pours.
Fit-out, licensing, merchandising, opening buy and hiring up to the grand opening.
Development, pre-production, principal photography, post and delivery.
Space, stand build, shipping deadlines and lead follow-up around fixed show dates.
Design, equipment, infection-control sign-off, staffing and first patient.
Timetabling, admissions, term dates, assessment windows and the budget cycle.
Consents, utilities diversions, earthworks, pavement layers and traffic management.
Racking, WMS integration, MHE, inventory transfer and go-live ramp.
Demand plan, material lead times, line scheduling, changeovers and dispatch.
Floor-by-floor closures with the hotel still trading — noise windows and room-nights lost.
Quay wall, dredging, crane delivery and TOS, around marine weather windows.
Design, FAT, and installation inside engineering possessions booked months ahead.
Approval, validation batches, serialisation and reimbursement gating every commercial date.
Call for papers, programme, sponsorship, ticketing tiers, AV and run of show.
A repeatable per-unit sequence run in overlapping waves across many sites.
Civils, MEIC, then a witnessed performance test on live flow that cannot be simulated.
Phased possessions behind hoardings while the terminal keeps operating airside.
Wayleaves, duct survey and build, run as overlapping area waves to ready-for-service.
Bowl, roof and pitch establishment against an opening fixture nobody can move.
Loans, couriers, conservation windows and gallery stabilisation before a fixed opening.
TBM manufacture and launch, the drive through mixed ground, cross-passages and breakthrough.
Base build, cleanroom protocol changeover, tool hook-up on utility readiness, first silicon.
Right-of-way, environmental windows, the welding spread down the route, hydrotest and tie-in.
Casting and rehearsal room back-passed from a press night that is fixed and sold.
Credentialing runs on its own long clock, alongside licensing, medical gas and infection control.
The dry room gates every tool move-in; formation, aging and a long yield ramp follow.
You cannot dismantle faster than you can dispose — waste route and dose budget drive it.
Self-study back-passed from a site visit date and a commission meeting you do not control.
Soil temperature opens the window, growth stages drive the sprays, drying limits the cut.
Pre-sale runs ahead of fit-out; the founding-member target gates the launch decision.
The programmes that run across a whole organization — where the delay is usually an approval, a lead time or a licence rather than the work itself.
Discovery, design, build, data migration, testing, cutover weekend and hypercare.
Day one readiness, org design, finance, systems and tracked synergy delivery.
Search, lease, fit-out, circuits, move weekend and dilapidations on the old lease.
Power, design, long-lead plant, shell, MEP fit-out and Level 1–5 commissioning.
Lease, permits, build-out, equipment, licensing, hiring and the soft opening.
Protocol, ethics approval, site initiation, enrolment, database lock and reporting.
Plans for HR, content teams and new-hire ramp-ups.
Pre-boarding, week 1 and 90-day milestones for HR and managers.
Plan blog, email and social content with owners and deadlines.
Structure your first 90 days in a new role: learn, contribute, lead.
Role approval through sourcing, interviews and offer to the actual start date.
Annual plan, scoping, fieldwork, findings, management response and follow-up.
Gap analysis, QMS documentation, internal audit and the two-stage certification audit.
Control design, remediation and the observation window a Type II cannot compress.
Telephony, forecasting, hiring waves and training cohorts landing before the volume does.
Draft, align, commit, mid-quarter check-in and close — with the cycles overlapping.
Internal audit and management review before Stage 2, with the mandatory gap for corrective action.
Impact assessment, sponsor roadshows, training timed to go-live, and the reinforcement everyone cuts.
Aspects and impacts plus the legal register drive the objectives; two-stage audit with a gap.
Entry and exit criteria, environment and data readiness, overlapping phases, the defect loop.
Worker consultation is a requirement of the standard, so it is scheduled, not announced.
Most of the critical path belongs to the customer; front-load one usable outcome.
Grids sized to your horizon — a week, a month, or a full year.
Map iterative work to a timeline without losing flexibility.
Prefer a specific tool? Grab a Gantt pre-built for Excel, Sheets or PowerPoint.
A stacked-bar Gantt built in a spreadsheet — type dates and the bars draw themselves.
A slide-ready timeline of editable shapes — perfect for status decks.
Landscape A4 and US Letter, writable row height, clean vector PDF export.
Plan on a page: phase-level bars and key milestones on a single A3 or A4 sheet.
Import into Google Sheets for a free, shareable cloud Gantt chart.
A minimal, no-frills Gantt chart with a handful of tasks.
Yes. Every template is 100% free to download and free to edit online — no account, no trial, and no credit card. You can export your finished chart to PDF, PNG, Excel and PowerPoint at no cost.
No. There is no sign up and no login. Click a download button to grab the file, or click "Edit online free" to open the template directly in your browser.
Most templates are available as Excel (.xlsx), PowerPoint (.pptx) and CSV. You can also open any template in the online editor and export to PDF or PNG as well.
Yes. Download the Excel or CSV file and use File → Import in Google Sheets, or start from the Google Sheets template. You can also skip Sheets entirely and edit online.
Pick a template, customize it in your browser, and export to Excel, PowerPoint, PDF or PNG. Free forever, no sign up.
Open the Gantt maker →