Film Production Schedule Template

A free film production schedule template covering the whole picture, development and financing, pre-production and casting, the shoot itself, post through picture lock, sound and colour, and the delivery package the distributor actually requires. Download it for a financing pack, or open it online to link the dependencies that decide whether your delivery date survives.

Preview of the film production schedule template showing phases across a timeline

What's included

Every department works to the shoot dates, and everything after the shoot works to the delivery date. The template puts both fixed points on the chart and lets the rest arrange itself around them:

Who uses this template

Line producers, first assistant directors, and production coordinators use this to steer a feature or series from development through delivery. It covers pre-production, principal photography, post, sound, colour, and final deliverables, giving directors, department heads, and financiers a shared view of when each phase locks and where the schedule is tight.

Principal photography is the only phase that cannot be extended without spending real money per day. Everything before it exists to make the shoot possible, and everything after it inherits whatever the shoot produced. Fix the shoot dates first, then check that pre-production has enough runway behind them, not the other way round.

How to customize it

  1. Set your shoot start and wrap dates first and let pre-production count backwards from them.
  2. Add one row per shooting block or location so the move days are visible; unplanned company moves eat shoot days.
  3. Extend the VFX rows and start them earlier if you have a meaningful shot count, VFX often runs from the shoot to the final mix.
  4. Put festival submission deadlines on the chart as milestones; they are fixed dates that pull the whole post schedule forward.
  5. Keep contingency days inside principal photography rather than at the end, where they are indistinguishable from slipping.

Scheduling tips

Frequently asked questions

How long does a film production schedule run?

For an independent feature, commonly 12-18 months from greenlight to delivery, roughly two to three months of pre-production, four to eight weeks of photography, and six to nine months of post and delivery. The template uses a schedule in that range.

What are the phases of film production?

Development, pre-production, principal photography, post-production and delivery. This template splits post into picture and sound-and-finishing, because picture lock is the gate that separates them.

How much pre-production time do I need?

Enough to cast, scout, permit and build before day one. Eight to twelve weeks is common on a modest feature, and cutting it short shows up as lost days during the shoot rather than as savings.

Does this include VFX?

Yes, VFX shot delivery sits in the finishing phase and starts during post. If your shot count is significant, pull those rows earlier so vendor work overlaps the edit.

Is the film production template free?

Yes. Free Excel, PowerPoint and CSV downloads, and free online editing with no account and no watermark.